Final | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Final ok
|
Permanent Service | 8/17/2018 | 8/17/2018 | 8/17/2018 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack p/s u/g n ok
|
Electrical Rough-In | 8/17/2018 | 8/17/2018 | 8/17/2018 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Soffits only ok to cover
|
Permanent Service | 8/13/2018 | 8/13/2018 | 8/13/2018 | A | FAIL |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack 230.95 C Proformance testing required. 110.24 Available fault current shall be posted.
|
Electrical Rough-In | 6/23/2018 | 6/25/2018 | 6/25/2018 | A | PASS |
James Ady
|
|
|
light pole bases Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Pole bases And underground only ok to cover
|
Electrical Rough-In | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Rock A. Hudson
|
|
|
light pole bases Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Pole bases with bond to cage rough in ok cover
|
Electrical Rough-In | 6/7/2018 | 6/7/2018 | 6/7/2018 | P | PASS |
Rock A. Hudson
|
|
|
ug conduit Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Team room branch circuit underground rough in ok cover
|
Electrical Rough-In | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
Rock A. Hudson
|
|
|
ug conduit Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Branch circuit underground to be done in future. Service entrance conduits under slab rough in ok cover
|
Electrical Rough-In | 5/9/2018 | 5/10/2018 | 5/10/2018 | A | PASS |
James Ady
|
|
|
Ufer Phone #: ###-#### Inspection requested via web by Lee VanSchoiack UFER only ok to cover
|
Electrical Rough-In | 5/9/2018 | 5/10/2018 | 5/9/2018 | P | CANC |
James Ady
|
|
|
ufer Phone #: ###-#### >> Inspection requested via web by Lee VanSchoiack Inspection cancelled from web by: Lee VanSchoiack
|