Final | 9/13/2018 | 9/14/2018 | 9/14/2018 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Winters LLC Final ok
|
Final | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | PART |
Eric Story
|
|
|
(tamper rec installed) Phone #: ###-#### Inspection requested via web by Brandon Winters Need to Move GFCI for water fountain to panel and lockout for water heater Signed Temp occ
|
Final | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | FAIL |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Brandon Winters 406.12(6) tamper resistant receps required.
|
Electrical Rough-In | 9/7/2018 | 9/7/2018 | 9/7/2018 | P | PASS |
Tom Saunders
|
|
|
above lay-in ceiling rough in Phone #: ###-#### Inspection requested via web by Brandon Winters...tiles installed before inspection..verified areas opened
|
Electrical Rough-In | 7/17/2018 | 7/18/2018 | 7/18/2018 | A | PASS |
Eric Story
|
|
|
Wall rough-in please Phone #: ###-#### Inspection requested via web by WintersLLC Walls only ok to cover
|