Final | 1/8/2019 | 1/8/2019 | 1/8/2019 | P | PASS |
Tom Saunders
|
|
|
final on LED fixtures Phone #: ###-#### Inspection requested via web by Tim Dunlop... job complete...ok to final
|
Electrical Rough-In | 12/14/2018 | 12/14/2018 | 12/14/2018 | P | PASS |
Tom Saunders
|
|
|
working in the generations building (east side building) this afternoon Phone #: ###-#### Inspection requested via web by Tim Dunlop... UL listing verified on replacement fixture thru out building...all same fixture
|
Electrical Rough-In | 7/17/2018 | 7/18/2018 | 7/17/2018 | A | CANC |
Tom Saunders
|
|
|
rough in on LED fixtures Phone #: ###-#### >> Inspection requested via web by Tim Dunlop Inspection cancelled from web by: Tim Dunlop
|