Final | 2/21/2019 | 2/22/2019 | 2/22/2019 | A | PASS |
James Ady
|
|
|
Contact Toby Davis Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Final ok
|
Electrical Rough-In | 2/14/2019 | 2/14/2019 | 2/14/2019 | P | PASS |
James Ady
|
|
|
Please call Toby for cover inspection of ceiling in seating area of B36. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Ceiling only ok to cover
|
Electrical Rough-In | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
James Ady
|
|
|
Please call Toby for inspection of exterior covered canopy area. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Area listed only ok to cover
|
Final | 1/14/2019 | 1/14/2019 | 1/14/2019 | A | PART |
James Ady
|
|
|
Please call Toby for TCO final of expansion at B36. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Phase 1 TCO OK.
|
Electrical Rough-In | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
James Ady
|
|
|
Please call Toby for ceiling grid inspection of main grid area in B36 expansion. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Main area only halways not ready Grid ok to cover
|
Electrical Rough-In | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | PASS |
James Ady
|
|
|
Please call Toby for R/I inspection of cafeteria expansion walls. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Storage room walls only ok to cover
|
Electrical Rough-In | 12/3/2018 | 12/4/2018 | 12/4/2018 | A | PASS |
James Ady
|
|
|
Please call Toby for wall cover R/I of B36 Expansion. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo exterior wall and columns only ok to cover
|
Electrical Rough-In | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | CANC |
James Ady
|
|
|
Call Toby for general trim of area in servery at B36. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo
|
Final | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PART |
James Ady
|
|
|
Call Toby for general trim of area in servery at B36. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Partial final on phase 2 only ok
|
Electrical Rough-In | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
James Ady
|
|
|
Please call Toby for ceiling grid inspection in servery area. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Reinspect of hard lid access panels and drop ceiling ok to cover
|
Electrical Rough-In | 11/2/2018 | 11/2/2018 | 11/2/2018 | A | FAIL |
James Ady
|
|
|
Please call Toby for hard lid ceiling inspection at B36 in the servery area. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo 314.29. Junction boxes shall be accessible(4 seperate locations in hard lid area)
|
Electrical Rough-In | 10/26/2018 | 10/26/2018 | 10/26/2018 | A | PASS |
Rock A. Hudson
|
|
|
Please call Gary for R/I inspection of walls in servery. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo No columns, or hardlids. Walls only servery rough in ok cover
|
Electrical Rough-In | 10/6/2018 | 10/8/2018 | 10/8/2018 | A | PASS |
James Ady
|
|
|
Please call Toby for ceiling grid inspection at B36. Thank you. Phone #: ###-#### Inspection requested via web by Rafael Castillo Misc underground in Cafeteria, Grid in office by cooler and floor boxes under sky bridge ok to cover
|
Electrical Rough-In | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | PASS |
Rock A. Hudson
|
|
|
Please call Toby for wall R/I inspection on B36 renovation.
Thanks! Phone #: ###-#### Inspection requested via web by Rafael Office 104 and storage 104(A) wall rough in ok cover.
|
Electrical Rough-In | 7/9/2018 | 7/9/2018 | 7/9/2018 | P | PASS |
James Ady
|
|
|
Wall Rough In Early PM if possible (1pm) Contact Toby Davis ###-#### Thank you, Phone #: ###-#### Inspection requested via web by Tom Betty 1 hall wall only ok to cover
|