Final | 11/6/2018 | 11/6/2018 | 11/6/2018 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Girard final ok
|
Electrical Rough-In | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | PASS |
James Ady
|
|
|
Access through right side gate Phone #: ###-#### Inspection requested via web by Brad Girard Master bed addition rough /in ok
|