Final | 2/27/2019 | 2/27/2019 | 2/27/2019 | P | PASS |
Mark Moncarr
|
|
|
ADU in back, ready for final. Phone #: ###-#### Inspection requested via web by Dean Gernaat Ok final.
|
Electrical Rough-In | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | PASS |
Mark Moncarr
|
|
|
Tile floor heat ok to cover Phone #: ###-#### Inspection requested via web by Dean Gernaat Ok cover flr heat mstr.
|
Electrical Rough-In | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | PASS |
Mark Moncarr
|
|
|
Trench Inspection Phone #: ###-#### Inspection requested via web by Dean Ok cover underground. Talked to contractor about hottub location. It is in a temp location until work is done, then it will move. Overhead drop of home next door will need to be considered when relocation tub. Overhead conductors need to be minimum 10' horizontally away from inside waters edge of tub.
|
Rough-In Permanent Service | 12/5/2018 | 12/5/2018 | 12/5/2018 | A | PASS |
Mark Moncarr
|
|
|
Best access is from alley Phone #: ###-#### Inspection requested via web by Dean Gernaat p/s o/h n ok
|