Final | 2/13/2019 | 2/14/2019 | 2/14/2019 | A | PASS |
Tom Saunders
|
|
|
Brian Phone #: ###-####... labelling, disconnect, and OCPD ok
|
Electrical Rough-In | 2/13/2019 | 2/14/2019 | 2/14/2019 | A | PASS |
Tom Saunders
|
|
|
Brian Phone #: ###-####... UL listed equipment verified...installer met and removed material for verification line side tap
|
Final | 2/7/2019 | 2/13/2019 | 2/13/2019 | A | CANC |
Tom Saunders
|
|
|
Inspection cancelled by contractor. Need to do rough-in first. GF Main Electrical Service Panel located in Garage. Contractor Phone: ###-#### Phone #: ###-#### >> Inspection requested via web by BRS Permitting
|
Electrical Rough-In | 2/6/2019 | 2/6/2019 | 2/6/2019 | P | CANC |
Tom Saunders
|
|
|
Contact: Jason Curley ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting...scheduled for wrong day
|