Final | 2/14/2019 | 2/15/2019 | 2/15/2019 | P | PASS |
James Ady
|
|
|
Please give as much notice as possible. Neil will be offsite and will need about half an hour to make it out there. Phone #: ###-#### Inspection requested via web by Garrett Collins final ok
|
Electrical Rough-In | 2/12/2019 | 2/13/2019 | 2/13/2019 | A | PASS |
James Ady
|
|
|
Neil will be on site. Phone #: ###-#### Inspection requested via web by Garrett Collins Rough in only Feed from 480v service to 208 trans and panel ok Need to final when main breaker is installed
|