Final | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | PASS |
Mark Moncarr
|
|
|
install complete; all work done according to approved plans; stamped plans on site; call Rob at our office before you head over so that we can get you access into garage - 208.936.0358 call Jed if you have any questions about the work - 801.875.3714 Phone #: ###-#### Inspection requested via web by Ryan King Ok final. 60a disconnect installed with 60a fuses. Line side connection made. All labeling required is present.
|
Final | 2/26/2019 | 2/27/2019 | 2/26/2019 | A | CANC |
Mark Moncarr
|
|
|
ready for final inspection; install done per approved plans; approved plans on site; call Jed if you have any questions at all - 801.875.3714 call Ryan King if any questions about the plans and layout thanks guys Phone #: ###-#### >> Inspection requested via web by Ryan King Inspection cancelled from web by: Ryan King
|
Electrical Rough-In | 2/12/2019 | 2/12/2019 | 2/12/2019 | P | PASS |
Mark Moncarr
|
|
|
listing inspection for solar panels Phone #: ###-#### Inspection requested via web by Ryan King Ok cover. Verified UL listing of components.
|