Final | 6/12/2020 | 6/12/2020 | 6/12/2020 | P | PASS |
James Ady
|
|
|
Zach - *SCREENED* Phone #: ###-#### final ok
|
Electrical Rough-In | 3/21/2019 | 3/22/2019 | 3/22/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Hilke Correction made. Box brought down out of ceiling. Ok cover.
|
Electrical Rough-In | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | FAIL |
James Ady
|
|
|
A new addition was already inspected, the interior work is ready now. If no one is there call Zach Arnstam at ###-#### for access. Phone #: ###-#### Inspection requested via web by Dan Hilke 314.29. Boxes shall be accessible. J Box above Sprinkler lime clock. As per BLD smoke detectors shall be added. Note: 4/0 light box in bedroom is listed for ceiling fan support.
|
Electrical Rough-In | 3/2/2019 | 3/4/2019 | 3/4/2019 | A | PART |
Mark Moncarr
|
|
|
This is for a partial rough-in, so the walls can be covered in a new addition. There will be more work done inside once the addition is closed in. The addition is on the back of the house, accessible by going around the house on the right side. Phone #: ###-#### Inspection requested via web by Dan Hilke Ok cover addition. More electrical work to be done as per contractor.
|
Rough-In Permanent Service | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | PASS |
James Ady
|
|
|
relocating service and panel, to be reconnected later today. Please call after lunch so we can tell you what time we''ll be ready for inspection. Phone #: ###-#### Inspection requested via web by Dan Hilke p/s o/h rec ok
|