Final | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | NR |
Daryl DeGrange
|
|
|
Relocate monument sign. All Primary power by others Phone #: ###-#### Inspection requested via web by Ken Olsen Not ready for final at this time, power to sign has not been connected by on site electrical contractor.
|
Electrical Rough-In | 4/26/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Tom Saunders
|
|
|
Requesting 11:30 am inspection. Relocating monument sign Phone #: ###-#### Inspection requested via web by Ken Olsen... new disconnect and UL stickered
|
Electrical Rough-In | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | CANC |
Tom Saunders
|
|
|
Requesting 11:30 inspection time. Relocation of monument sign Phone #: ###-#### >> Inspection requested via web by Ken Olsen Inspection cancelled from web by: Ken Olsen
|
Electrical Rough-In | 4/23/2019 | 4/26/2019 | 4/26/2019 | P | CANC |
Tom Saunders
|
|
|
Requesting 1:30 PM inspection time. Relocate existing monument sign. Phone #: ###-#### >> Inspection requested via web by Ken Olsen Inspection cancelled from web by: Ken Olsen
|
Electrical Rough-In | 4/23/2019 | 4/24/2019 | 4/23/2019 | P | CANC |
Tom Saunders
|
|
|
Requesting 1:00 pm inspection time. Relocate existing monument sign. All Primary Power by Others Phone #: ###-#### >> Inspection requested via web by Ken Olsen Inspection cancelled from web by: Ken Olsen
|