Final | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | PASS |
Rock A. Hudson
|
|
|
Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Area in question not a storage space, it is a crawl space, no luminaire required. Final ok
|
Final | 8/27/2019 | 8/28/2019 | 8/28/2019 | A | PART |
James Ady
|
|
|
Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen 210.70C Underfloor spaces used for storage shall have at least 1 lighting outlet. Patial final only ok
|
Electrical Rough-In | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | PASS |
Rock A. Hudson
|
|
|
Basement ceiling cover. Buster is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Area noted rough in ok cover
|
Electrical Rough-In | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | PASS |
James Ady
|
|
|
Ceiling cover in area B. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Area B minus Stairs ceilings ok to cover
|
Electrical Rough-In | 7/1/2019 | 7/1/2019 | 7/1/2019 | P | PASS |
James Ady
|
|
|
Ceiling cover. Phone #: ###-#### Inspection requested via web by Buster Bowen Area "A" minus back entry hall Ceiling only ok to cover
|
Permanent Service | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Rock A. Hudson
|
|
|
Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen 85K rated main, available fault current will verify on future trip due to Idaho power has not released plans for new transformer and service entrance conductors at time of inspection. p/s u/g n ok
|
Electrical Rough-In | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Rock A. Hudson
|
|
|
Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Entrance, reception, stairway drop lid rough in ok cover
|
Electrical Rough-In | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | PASS |
Rock A. Hudson
|
|
|
Rough in inspection. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Basement walls and conference hardlid rough in ok cover
|
Electrical Rough-In | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | PASS |
Rock A. Hudson
|
|
|
UG cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Procedure room underslab and work room rough in ok cover
|
Electrical Rough-In | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PASS |
Rock A. Hudson
|
|
|
Wall Cover. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Area (B) walls and hard lids, basement conference room only floor receptacle pour rough in ok cover
|
Electrical Rough-In | 3/21/2019 | 3/21/2019 | 3/21/2019 | A | PASS |
Rock A. Hudson
|
|
|
Cover inspection. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen West walls only rough in ok cover
|
Electrical Rough-In | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Danny. Wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy 110.3- Provide documentation on terminating MC with secondary equipment grounding conductor. All have been cut off. 300.4- Where MC is run through holes that do not maintain 1 1/4" from framing surface they shall be protected from physical damage. All shallow studs west and south sides.
|