Final | 8/2/2019 | 8/2/2019 | 8/2/2019 | P | PASS |
Rock A. Hudson
|
|
|
Final Phone #: ###-#### Inspection requested via web by Casey Fouts Final ok
|
Final | 7/31/2019 | 8/1/2019 | 8/1/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Final inspection invite. Please call me 30min in advance Phone #: ###-#### Inspection requested via web by Casey Fouts 210.8(B)- Main bar area existing plug strip not GFCI protected right of entry to bar. Section to right of GFI. 314.25- All boxes shall have covers. Receptacle above main bar. Expoed MC and no cover on receptacle. 330.12- MC shall not be installed where subject to physical damage. MC exposed in upstairs bar, need wall cover. 406.5- Receptacles shall not be installed face up in counter top spaces. Receptacles located in main bar center counter top shall be installed in a listed box for this application,
|
Electrical Rough-In | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Rock A. Hudson
|
|
|
1st floor walls. Phone #: ###-#### Inspection requested via web by Casey Fouts Storage room walls rough in ok cover
|
Electrical Rough-In | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Rock A. Hudson
|
|
|
Rough in ceiling 1st floor. Phone #: ###-#### Inspection requested via web by Casey Fouts Called and had ELE attached to BLD 19-00936. Ceiling area over sunken floor main bar area only rough in ok cover
|