Final | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | PASS |
Mark Moncarr
|
|
|
call 30 ahead- Larry Phone #: ###-#### Ok final
|
Electrical Rough-In | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Mark Moncarr
|
|
|
Call 10 mins ahead- Larry Phone #: ###-#### Ok cover garage. W lower portion of wall to be covered, and SE corner bath.
|
Conference | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | DONE |
Mark Moncarr
|
|
|
Larry Phone #: ###-#### Discussed using outside gutter by panel to feed circuits into garage
|
Rough-In Permanent Service | 6/7/2019 | 6/10/2019 | 6/10/2019 | A | CANC |
Rock A. Hudson
|
|
|
Larry- inground cover inspection Phone #: ###-#### Needed rough in inspection.
|
Electrical Rough-In | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Rock A. Hudson
|
|
|
Larry- inground cover inspection Phone #: ###-#### Underground rough in ok cover
|