Final | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
James Ady
|
|
|
We will leave plans onsite at the Idaho Power meter and the garage open for viewing the inverters/interconnection by United electric Phone #: ###-#### Inspection requested via web by Jesse Simpson final ok
|
Electrical Rough-In | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | PASS |
James Ady
|
|
|
Guys should be on site with solar panel and optimizer with UL listing for project. Please give Micah a ring at ###-#### with any questions. Thanks! Phone #: ###-#### Inspection requested via web by Jesse Simpson Listing only ok
|
Electrical Rough-In | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | FAIL |
James Ady
|
|
|
Our guys should be out on site. Please give Micah a call at ###-#### if you have any questions. Thanks! Phone #: ###-#### Inspection requested via web by Jesse Simpson No panels onsite Re-call when panels are onsite and before intalled
|