Final | 8/27/2019 | 8/28/2019 | 8/28/2019 | A | PASS |
Mark Moncarr
|
|
|
For access please call Josh 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott Ok final.
|
Electrical Rough-In | 6/18/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
James Ady
|
|
|
For access please call Josh 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott 2nd floor, Master bed, Bath and closet. Hall bath ok to cover. P/F boxes added in the other beds and smokes through out. (No walls were opened in the back bedrooms.)
|