Final | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | PASS |
Mark Moncarr
|
|
|
Key is between windows set on house nearest red shop. Phone #: ###-#### Inspection requested via web by Cevyn Recla Ok final.
|
Rough-In Permanent Service | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Cevyn Recla Ok cover. p/s u/g n ok
|
Electrical Rough-In | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PASS |
Mark Moncarr
|
|
|
Some groundwork under slab on grade. Kitchen island and 2 floor outlets Phone #: ###-#### Inspection requested via web by Cevyn Recla Ok cover floor boxes and island conduit.
|
Electrical Rough-In | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PASS |
Mark Moncarr
|
|
|
Ufer was missed at pour. Placed 20 ft #4 at footing, and conduit to island under slab. Phone #: ###-#### Inspection requested via web by Cevyn Recla Ok cover conduit for island
|