Final | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | PASS |
Mark Moncarr
|
|
|
The garage door code is 5170. The floor receps on the 2nd level were eliminated and spliced in the garage ceiling with blank covers. The floor heat was eliminated and spared off in the Master Bath. Please let me know if you have any questions. Thanks, Dan Phone #: ###-#### Inspection requested via web by Dan Jennings Ok final.
|
Permanent Service | 4/8/2020 | 4/9/2020 | 4/9/2020 | A | PASS |
Mark Moncarr
|
|
|
New meter main on front of unit. Re routed under, separated the neutrals/grounds in sub panel and ran SER to sub panel. Phone #: ###-#### Inspection requested via web by Dan Jennings p/s u/g n ok
|
Rough-In Permanent Service | 3/2/2020 | 3/3/2020 | 3/3/2020 | A | PASS |
Mark Moncarr
|
|
|
Please let me know if you have any questions! Thank you! Phone #: ###-#### Inspection requested via web by Dan Jennings Ok cover. Talked to Brian mech inspector, and to Carl the builder. Tray cable that HVAC used for mini splits is not JP rated which would allow it to pass through structural members. May need to replace all wires not rated. p/s u/g n ok
|
Electrical Rough-In | 1/28/2020 | 1/28/2020 | 1/28/2020 | P | PASS |
Tom Saunders
|
|
|
Inspection request for shared firewalls only, I will be onsite until 2pm. These are ready for inspection so anytime. There are not any boxes installed in these walls, they will all be cut-ins. Phone #: ###-#### Inspection requested via web by Dan Jennings...ok to cover
|