Site Final | 5/18/2017 | 5/18/2017 | 5/18/2017 | A | PASS |
Andy J. Long
|
|
|
Project complete, disturbed area stabilized/landscaped, no loose dirt or construction materials around site.
|
General Inspection | 2/23/2017 | 2/27/2017 | 2/27/2017 | P | PASS |
Melissa Jannusch
|
|
|
Corrections addressed
|
General Inspection | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | FAIL |
Melissa Jannusch
|
|
|
No ESC signs posted. Trackout. Corrections requested: move pile out of alleyway Spoke with Brett has sweeper scheduled. Will move pile and post signs
|
Site Preparation | 11/21/2016 | 11/21/2016 | 11/22/2016 | P | PASS |
Andy J. Long
|
|
|
John Phone #: ###-####
|