Aging Inspection | 3/17/2017 | 3/17/2017 | 3/17/2017 | | PASS |
Andy J. Long
|
|
|
Home complete and occupied. WIP on remaining landscaping at Bryn Mawr cottages with permits open. No ESC corrections needed.
|
DOC - Permit Finaled | 3/17/2017 | 3/17/2017 | 3/17/2017 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | PASS |
Andy J. Long
|
|
|
Bill Phone #: ###-####
Site is prepared for excavation. Access drive and permeable pavers for parking were installed previously. MS4 inlet on Targee has sediment bag installed. Perimeter silt fence and clearing limit is established. Permit signs posted. Reminder to have trash containment and concrete washout during foundation work.
|