Site Final | 3/17/2017 | 3/17/2017 | 3/17/2017 | A | PASS |
Andy J. Long
|
|
|
6 car garage complete and in use. WIP on remaining landscaping at Bryn Mawr cottages with permits open. No trackout or discharge.
|
General Inspection | 3/16/2017 | 3/16/2017 | 3/17/2017 | | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 9/9/2016 | 9/12/2016 | 9/12/2016 | A | PASS |
Andy J. Long
|
|
|
Bill Phone #: ###-####
Sediment filter bag installed on Targee for previously issued cottage permits is in good shape. No violations at site. Permit signs posted, Approved for construction.
|