General Inspection | 7/2/2018 | 7/2/2018 | 7/2/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 7/2/2018 | 7/2/2018 | 7/2/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 5/15/2018 | 5/15/2018 | 5/15/2018 | | PASS |
Michael Zawacki
|
|
|
Work nearly complete. Only exposed area is along south side, next to canal. Interior is paved and most exterior is landscaped.
|
General Inspection | 3/28/2018 | 3/28/2018 | 3/29/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. Inside site is muddy, no mud or trackout leaving site. Most storage shells complete.
|
General Inspection | 2/7/2018 | 2/7/2018 | 2/9/2018 | P | PASS |
Michael Zawacki
|
|
|
WIP. Site is contained. No stabalized entrance and everyone is parking on site. Swift has been sawcut and needs to be repaired, loose rocks on street.
|
Random Inspection | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | FAIL |
Michael Zawacki
|
|
|
No entrance, excessive tracking onto swift. Sout perimeter doesn't have perimeter control around canal, some spots grading is all the way to edge. Pads have been poured, washout clean and on site.
|
General Inspection | 8/16/2017 | 8/16/2017 | 8/16/2017 | A | PASS |
Andy J. Long
|
|
|
Site initial grading and utilities installed. No trackout, windblown dust, or other issues. ESC permit sign and NOI info posted. Approved.
|
Site Preparation | 7/27/2017 | 7/28/2017 | 7/28/2017 | A | PASS |
Andy J. Long
|
|
|
call steve with meeting time
Permit sign and ESC plan posted on site. Wattle has been installed along the irrigation ditch at south limit of disturbance. Will remove trees, but advised to preserve grasses on bank.
Work to begin next Monday, will install construction entrance onto Cole and insert fiber mat on storm drain on Cole, just south of site. Grading company to have fugitive dust control onsite.
|