DOC - Permit Finaled | 8/16/2017 | 8/16/2017 | 8/16/2017 | P | PASS |
Andy J. Long
|
|
|
Demolition phase complete, project now covered by ESC17-00637 for new construction.
|
General Inspection | 7/17/2017 | 7/19/2017 | 7/19/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP on removing rubble. Water truck on site. No dust observed. Sweeping of paved area currently underway. No corrections.
|
Site Preparation | 7/17/2017 | 7/17/2017 | 7/17/2017 | P | PASS |
Andy J. Long
|
|
|
Water truck with large diameter hose on site for fugitive dust control. WIP. No discharges offsite or to onsite drain. Will check for full clean up of demolished materials on Wednesday 7/19
|