Site Final | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Andy J. Long
|
|
|
See ESC17-00138 and ESC17-00936 for remaining ESC corrections. This permit finaled.
|
General Inspection | 9/17/2018 | 9/17/2018 | 9/17/2018 | | FAIL |
Michael Zawacki
|
|
|
Lots of mud in gutter on Pasadena. Paint washout has been thrown on dirt and sidewalk. About half of landscaping complete.
|
General Inspection | 7/31/2018 | 7/31/2018 | 8/1/2018 | | PASS |
Michael Zawacki
|
|
|
All buildings are framed and work is on interior. Interior parking lot is paved and gutters conpleted. Some sections of sidewalk along Owyhee need repair. Some loose trash in site, some areas of sidewalk are covered with dirt and pit run.
|
General Inspection | 6/14/2018 | 6/14/2018 | 6/14/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on vertical and interiors. Site has had parking lot paved, no workers driving on exposed dirt. Curbing complete around perimeter, most sidewalks done. Site is free from trash.
|