Site Final | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | PASS |
Michael Zawacki
|
|
|
|
Random Inspection | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Andy J. Long
|
|
|
Foundations poured. NO framing work yet. Site very clean, no trash. No loose dirt on hard surfaces. Permit sign posted.
|
Random Inspection | 10/31/2017 | 10/31/2017 | 10/31/2017 | P | PASS |
Michael Zawacki
|
|
|
Working on forms for pouring concrete. Washout on site.
|