General Inspection | 10/3/2018 | 10/3/2018 | 10/3/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | PASS |
Michael Zawacki
|
|
|
Site is clean, area prepped for concrete, washout on site. Inlets in area protected, no runoff to greenbelt and river.
|
General Inspection | 8/9/2018 | 8/9/2018 | 8/9/2018 | | PASS |
Michael Zawacki
|
|
|
Small contained work area. Concrete washout on site, inlets are protected. Workers are currently doing compaction and breaking concrete. Water is beiung used to keep dust down.
|
General Inspection | 5/1/2018 | 5/17/2018 | 5/23/2018 | P | PASS |
Michael Zawacki
|
|
|
Site fenced off and contained. Nothing leaving site, free from dust.
|
General Inspection | 5/9/2018 | 5/10/2018 | 5/10/2018 | A | PASS |
Michael Zawacki
|
|
|
WIP, Suez water on site. Inlets in work area are protected. No dirt is leaving site and making it to river.
|
Random Inspection | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Andy J. Long
|
|
|
|