Site Final | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Michael Zawacki
|
|
|
|
BMP Violation | 6/18/2019 | 6/18/2019 | 6/18/2019 | P | FAIL |
Michael Zawacki
|
|
|
Washout dumped, rp notified. Reinspection will be scheduled under ESC18-00224
|
General Inspection | 1/14/2019 | 1/14/2019 | 1/14/2019 | P | PART |
Michael Zawacki
|
|
|
Some dirt on sidewalk, lots of trash on site, box is full. Section of drive not completed, keeps people from driving onto site.
|
Tracking Control | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | FAIL |
Michael Zawacki
|
|
|
No entrance, site is half froze and muddy. Left message with listed RP Justin. Some tracking onto northview.
|