rough grading to prepare site for construction of a single family residence and associated site improvements.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/29/20207/29/20207/29/2020 CANC
DetailsAndy J. Long
no activity
General Inspection7/14/20207/14/20207/14/2020 PASS
DetailsMichael Zawacki
No changes to site.
General Inspection6/29/20206/29/20206/29/2020 CANC
DetailsAndy J. Long
General Inspection6/12/20206/12/20206/16/2020 PASS
DetailsMichael Zawacki
No issues from rain event.
General Inspection5/28/20205/28/20205/28/2020 CANC
DetailsAndy J. Long
General Inspection5/13/20205/13/20205/19/2020 PASS
DetailsAndy J. Long
Looks like neighbor's retaining wall has been repaired.

No activity at site. Will continue to monitor. No muddy runoff from site observed. Appears vegetation and BMPs installed are working still.

BLD for house expires at the end of July
General Inspection4/28/20204/28/20204/29/2020 PASS
DetailsAndy J. Long
No activity at site. No sediment leaving site, disturbed slope has vegetation.

Can see that neighbor's downslope retaining wall does not seem to have been permanently fixed.
General Inspection4/13/20204/13/20204/14/2020 PASS
DetailsMichael Zawacki
No issues at site. No failures or dirt leaving site. No damage to wood wall below.
General Inspection3/27/20203/27/20203/27/2020 PASS
DetailsMichael Zawacki
No new activity, no issues
General Inspection3/12/20203/12/20203/12/2020 PASS
DetailsMichael Zawacki
No activity, no blow outs or issues.
General Inspection2/26/20202/26/20202/27/2020 PASS
DetailsAndy J. Long
No new activity. Site now has a BLD permit issued in addition to the GRD permit. No corrections at this time.
General Inspection2/11/20202/11/20202/11/2020 DONE
DetailsMichael Zawacki
General Inspection1/27/20201/27/20201/27/2020PPASS
DetailsMichael Zawacki
Nothing has left site.
General Inspection1/13/20201/13/20201/13/2020 PASS
DetailsMichael Zawacki
No new activity
General Inspection12/27/201912/27/201912/27/2019 PASS
DetailsAndy J. Long
No muddy runoff from site. No new issues or erosion observed
General Inspection12/12/201912/12/201912/12/2019PPASS
DetailsMichael Zawacki
No blow outs.
General Inspection12/3/201912/3/201912/3/2019 PASS
DetailsMichael Zawacki
No new activity, site still snow covered, is north facing.
General Inspection11/18/201911/18/201911/18/2019 PASS
DetailsMichael Zawacki
No activity. Silt fence is down, wattle and gator guard at bottom of drive.
General Inspection11/1/201911/1/201911/1/2019 PASS
DetailsMichael Zawacki
No new activity at site.
Weed growth and cover. Water conveyance system still on lot, silt fence is gone.
General Inspection10/17/201910/17/201910/17/2019PPASS
DetailsMichael Zawacki
No new activity, BMPs will need repair.
General Inspection10/3/201910/3/201910/3/2019 PASS
DetailsMichael Zawacki
Inspected 10-2, no new activity.
General Inspection9/17/20199/17/20199/17/2019PPART
DetailsMichael Zawacki
No runoff onto road, silt fence needs to be repaired. Vegetation starting to grow.
General Inspection9/4/20199/4/20199/4/2019 PASS
DetailsMichael Zawacki
No new activity. RP should do maintenance before rainy season
General Inspection8/20/20198/20/20198/20/2019 PASS
DetailsMichael Zawacki
Site is becoming stabilzed by weeds. Met with owner/builder last week, waiting for commitment before building on lot.
General Inspection8/2/20198/2/20198/2/2019 PASS
DetailsAndy J. Long
No activity. Slope has volunteer vegetation growing. No dirt leaving site.
General Inspection7/18/20197/18/20197/19/2019 PASS
DetailsMichael Zawacki
No new activity, hillside starting to grow
General Inspection7/3/20197/3/20197/3/2019 PASS
DetailsMichael Zawacki
No activity.
Weeds starting to grow on hillside.
General Inspection6/18/20196/18/20196/19/2019 PASS
DetailsMichael Zawacki
No new activity.
General Inspection5/29/20195/29/20195/29/2019PPASS
DetailsMichael Zawacki
No failures. Water conveyance system working, no new rilling. No sediment runoff, buildup behing wattles is getting high.
General Inspection5/21/20195/21/20195/21/2019PPASS
DetailsAndy J. Long
post rainfall inspection

- No sediment runoff detected.
- water diversion and flow through controls kept water from flowing over slope
- perimeter sediment barriers contained eroded sediment

Correction request:
- clean out mud behind perimeter controls.
General Inspection5/17/20195/17/20195/17/2019PPASS
DetailsMichael Zawacki
No runoff from site, no water coming down chute.
General Inspection5/7/20195/8/20195/10/2019APASS
DetailsMichael Zawacki
No new activity, sediment starting to build up behind perimeter wattle.
General Inspection4/9/20194/9/20194/9/2019PPASS
DetailsMichael Zawacki
post rainfall inspection
No runoff from site. Wattle has been installed on top to direct water to runoff system. Sediment is starting to get high on lower wattle. No standing water behind silt fence.
General Inspection4/3/20194/5/20194/5/2019ADONE
DetailsAndy J. Long
check if fines have been paid

Fees paid. Corrections in progress.
Conference4/1/20194/2/20194/3/2019PDONE
DetailsAndy J. Long
3:30 with Damion

BMP installations have stopped the flow of runoff over the cut slope and are directing water down a lined shoot to Curling to prevent picking up sediment. Wattles installed at toe of slope have contained sediment that has eroded from hill. It has been found that there is too much flow in the Curling gutter to have any sediment controls downhill from project.

Corrections requested:
- clean out accumulated sediment from behind wattles at bottom of slope. Place dirt up hill out of concentrated flow or spread evenly in the rills & compact and track as best as possible.
- maintain silt fence and clean out mud captured
- make plans to stabilize slope/remove excess dirt dumped on slope below the building pad
- get permits issued (ESC inspector to check with plan reviewer)
- pay ESC fines by the end of the week.
- consult with Gatorguard installation team on proper installation of wattles where flap is exposed, allowing sheet flow to pass under wattle
- install sediment control or slope drain to direct water from upper terrace to the lined lower terrace so that the conveyed water is not turbid by the time it reaches the lining.
Conference3/27/20193/27/20194/1/2019PPEND
DetailsAndy J. Long
rescheduled. RP had been out of town. Request to pay investigation fees this week and site meeting to plan slope stabilization and remaining corrections.
General Inspection3/11/20193/11/20193/12/2019PFAIL
DetailsAndy J. Long
Corrections needed:

- Rills on slope need raking, tracking, and either temporary vegetation, ground cover or erosion control blankets.

- all gator guard wattles need to be properly installed with staking and backfill per specifications

- fix silt fence, conduct maintenance.

Call made to Damion to inform that corrective actions are still needed. Fees have not been paid.
General Inspection3/7/20193/7/20193/7/2019PPART
DetailsMichael Zawacki
No new dirt leaving site, lots of dirt building behind perimeter controls. Rills on exposed hillside. Neighbors driveway wall has issues.
General Inspection2/15/20192/19/20192/26/2019ACANC
DetailsMichael Zawacki
General Inspection2/25/20192/25/20192/25/2019PPART
DetailsMichael Zawacki
No new runoff from site. Hillside still needs rills repaired and ground cover. Will continue to monitor during rain events.
General Inspection2/12/20192/14/20192/15/2019PPEND
DetailsAndy J. Long
RP-GC was on site 2/14 working on BMPs to prevent discharge. There was some muddy runoff flowing under wattles in a few spots adding to the turbidity in the gutter (315 NTU)

RP has contracted with Gatorguard to install a full set of BMPs including a slope drain to convey water down from upper level to the road without causing additional erosion.


General Inspection2/12/20192/12/20192/12/2019PPEND
DetailsAndy J. Long
check on SWO corrections and progress.

RP-GC has gathered BMPs during the wintery/frozen conditions over the last week and contracted Gator Guard to complete the installation.

SWO compliance date extended. RP has cleaned out mud behind bottom wattles and is monitoring site for thawing. Corrections in progress, compliance date extended.
Conference2/5/20192/6/20192/6/2019PDONE
DetailsAndy J. Long
1:00 PM

Reviewed corrective actions to be completed and new ESC site map sent to RP. Silt fence to be installed on main terrace to keep water away from slope and direct flow to the driveway, which will have check dams to slow velocity and an additional silt fence retention area at bottom of driveway.

Mud behind wattles has been scooped out as request. Need to finish sweep up when the mud thaws and gather BMPs to be ready for installation when there is a good weather window.


Corrective actions in progress.
Stop Work Order2/5/20192/5/20192/6/2019PCANC
DetailsAndy J. Long
duplicate entry
Stop Work Order2/5/20192/5/20192/6/2019ADONE
DetailsAndy J. Long
Per Andy L.

RP-GC notified of SWO issued for illicit discharges that occurred Feb 3 &4. Need to complete corrections listed in SWO notice:

- clean up all mud and dirt on pavement
- clean out mud captured behind wattles
- install BMPs per ESC site map and consult project's civil engineer/plan designer

SWO issued 2/5 PM. Compliance date is 2/12 PM
Conference2/5/20192/5/20192/5/2019PCANC
DetailsAndy J. Long
BMP Violation2/4/20192/4/20192/4/2019PFAIL
DetailsAndy J. Long
Muddy runoff from site. No RP or crew onsite to monitor runoff or attempt corrective actions.

Special investigation fee charged for have tracking mud in Crane Creek to source.

Immediate BMP maintenance is needed.
General Inspection1/30/20191/30/20191/30/2019PPEND
DetailsAndy J. Long
No new work or BMPs added since the first clean up and watttle placement.

still need to clean out dirt behind wattles and install additional controls on the upper section and stake in wattles.

RP should be back in town.
BMP Violation1/22/20191/23/20191/23/2019APEND
DetailsAndy J. Long
RP cleaned mud and debris out of gutter and placed a wattle at top of site for futher installation, ground is frozen.

Work to be completed before Friday by subcontractor Giovanni, who is to call for instructions.

- request to remove sediment and mud captured behind wattles
- more wattle installation per site meeting to be scheduled.
General Inspection1/22/20191/22/20191/22/2019PFAIL
DetailsAndy J. Long
Sediment runoff and erosion occuring on slope. NO corrective actions taken after request on Friday prior to rain.
General Inspection1/17/20191/17/20191/18/2019PCANC
DetailsAndy J. Long
General Inspection1/18/20191/18/20191/18/2019PFAIL
DetailsAndy J. Long
Runoff from upper portion of lot is now starting to flow down the disturbed slope and is causing a rill. Wattle is about to overflow but has trapped the mud so far.

Called RP, he is coming to clean up mud behind wattle and install a berm or wattle at top of slope to prevent water from flowing over the slope.
General Inspection12/17/201812/17/201812/17/2018PPASS
DetailsMichael Zawacki
Site still snow covered, on dark side, stays frozen longer.
General Inspection11/21/201811/21/201811/21/2018PPASS
DetailsAndy J. Long
No activity. No trackout or sediment runoff observed. Perimeter wattle installed properly as well geotextile gutter guards installed in the gutter. Permit sign posted.
General Inspection11/6/201811/8/201811/7/2018APASS
DetailsMichael Zawacki
Lot has been surveyed, no new earthwork.
General Inspection10/25/201810/25/201810/25/2018PPASS
DetailsMichael Zawacki
Site is holding up, no ESC issues.
General Inspection10/9/201810/9/201810/9/2018PPASS
DetailsMichael Zawacki
rainfall inspection.
Site has held up. Dirt is really tacky and obsorbing rainfall. No ponding or rills have formed.
Conference10/8/201810/8/201810/8/2018PDONE
DetailsAndy J. Long
Onsite conference with RP GC to discuss ESC plan and site inspections during rainfall. The receiving water for this project is Crane Creek, a tributary to the Boise River in addition to being a hillside site with steep slopes.

Corrections:
- RP to add additional gravel snake bags in gutter in front of site
- noted that the wattle will need to be re-installed after the excavator can complete earthwork on slope below driveway. Wattles must be trenched in at a minimum 2-3 ", staked every 5 ft, and have overlapping ends. Slope interupting wattle will be installed mid slope between driveway and toe of slope.
- berm to prevent water flowing over the steep slope
- RP to conduct site inspections during rainfall.

Site is currently well swept, no discharges or trackout. Will need to continue to work on wattle installations.
General Inspection10/8/201810/8/201810/8/2018PPASS
DetailsMichael Zawacki
Met with builder to discuss BMPs. Will need to monitor during rain event.
BMP Violation10/3/201810/3/201810/3/2018PFAIL
DetailsAndy J. Long
Road shoulder and gutter was swept as requested, wattles are still not trenched in and there is no other controls. Gravel bag check dam needs cleanup and replacement since it has been driven over.

Compliance extended to correct. Will meet on site with RP-GC this week to discuss additional controls and proper installation.
Conference10/1/201810/3/201810/3/2018ACANC
DetailsAndy J. Long
BMP Violation9/28/201810/1/201810/1/2018APEND
DetailsAndy J. Long
RP-GC was out of town last week.

Request to sweep road shoulder and gutter and to stake in wattles today. Conference scheduled for Wednesday
BMP Violation9/28/20189/28/20189/28/2018PFAIL
DetailsAndy J. Long
Multiple violations at site. RP has not responded to voicemails.

- Loose dirt in gutter and shoulder and some minor trackout across road.
- wattles are not staked and are not overlapping.
- rock bag check dam is ripped open
- hillside slopes have no BMPs installed

Last warning. Text message sent to RP.
General Inspection9/21/20189/21/20189/24/2018PCANC
DetailsAndy J. Long
General Inspection9/24/20189/24/20189/24/2018PFAIL
DetailsAndy J. Long
Corrections needed:

- sweep shoulder, gutter in front of and downhill from site.
- Perimeter wattle is installed, but is not staked or trenhed in properly.

VM for onsite conference requested to RP Damion.
General Inspection9/14/20189/14/20189/14/2018PPASS
DetailsMichael Zawacki
RPC done with rock work. Will need to monitor for hillside stabalization. Currently will not work if any moisture came.
General Inspection9/4/20189/7/20189/11/2018PPASS
DetailsMichael Zawacki
Site is contained. There is about a 25' section between silt fence and wattle not protected. Nothing currently running off site.
Conference8/31/20189/4/20189/4/2018APASS
DetailsAndy J. Long
call before you come-Damion Phone #: ###-####

Very steep hill on infill lot in Highlands. Initial excavation of driveway approach has began. Once driveway is cleared and excess dirt is hauled off, RP will install hillside and perimeter wattles. Rock retainiing wall will be placed prior to foundation work. RP-GC will be onsite to supervise and control traffic / spot for the excavator and dump trucks. Request to have ESC permit sign posted today.

Follow up inspection scheduled for Friday to check on wattle placement.
General Inspection8/13/20208/13/2020   
DetailsAndy J. Long