Information based on query as of Tuesday, April 23, 2024.
Permit Information
Permit NumberESC18-01375
StatusFinaled
Name JEREMY AMAR
Site Address 11758 W KING ST
Project NameFairview Apartments- bldg D1
Customer Number 
ePlanReviewNo
Description
see also ESC18-00659
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/21/20198/29/20198/30/2019PPASS
DetailsAndy J. Long
Building complete. Other ESC permits for site and remaining buildings are open
General Inspection8/21/20198/21/20198/21/2019 CANC
DetailsAndy J. Long
rescheduled for site final
Tracking Control7/2/20197/2/20197/8/2019PFAIL
DetailsAndy J. Long
complaint of dust


Loose dirt from landscaping and then blowing dust off sidewalks caused dust issue last week.

Discussed dust control requirements with onsite foreman Correction request to Biltmore have landscapers sweep up all loose material at the east end of King Street.

Follow up scheduled on main site permit, ESC18-00659.
General Inspection3/28/20193/28/20193/28/2019PPART
DetailsMichael Zawacki
Spoke with Bill Buch, project supervisor. Concern is no construction entrance, road is prepped with roadmix for the base. No way to get mud off tires, workers are parking on site in mud. Verbal warning issued to keep road clean and install rumble bars or other tire cleaning system.
Road is currently clean, says he sweeps at end of day, front entrance is closed and no one is supposed to use it. Major concern is if trackout starts to reach Fairview.
Conference2/8/20192/11/20192/12/2019PCANC
DetailsAndy J. Long
General Inspection2/12/20192/12/20192/12/2019PFAIL
DetailsAndy J. Long
Corrections needed:

- street sweeper needs to sweep Dawn Pl.
- concrete washout installed is now dried out but the wall on one is broken. Request to build new washout.

Note: re-inspection fees waived, warning and notification provided that any further mismanaged/dumped concrete washout will incur a violation fee.
Conference2/5/20192/5/20192/8/2019PCANC
DetailsAndy J. Long
rescheduled
BMP Violation1/25/20191/28/20191/28/2019PPEND
DetailsAndy J. Long
check on new washout

new above-ground lined washout installed and in use. Inspection conducted with Pat with Biltmore, requested the lining be secured to the sides, which was completed.

Corrections remaining:
- sweep gravel and rock out of the streets

Pat wants to have a meeting regarding the re-inspection fees assessed.

Case pending
BMP Violation1/23/20191/25/20191/25/2019PPEND
DetailsAndy J. Long
concrete to be poured Monday. Above ground lined washout will be constructed prior to the pour...

fees not yet paid.
BMP Violation1/23/20191/23/20191/23/2019PFAIL
DetailsMichael Zawacki
Trackout and washout dumped onto ground.
Corections needed:
Clean trackout, install construction entrance and stabalized parking area.
Remove and clean old washout, install new washout with liner.