Site Final | 8/21/2019 | 8/29/2019 | 8/30/2019 | P | PASS |
Andy J. Long
|
|
|
Building complete. Other ESC permits for site and remaining buildings are open
|
General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Tracking Control | 7/2/2019 | 7/2/2019 | 7/8/2019 | P | FAIL |
Andy J. Long
|
|
|
complaint of dust
Loose dirt from landscaping and then blowing dust off sidewalks caused dust issue last week.
Discussed dust control requirements with onsite foreman Correction request to Biltmore have landscapers sweep up all loose material at the east end of King Street.
Follow up scheduled on main site permit, ESC18-00659.
|
General Inspection | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PART |
Michael Zawacki
|
|
|
Spoke with Bill Buch, project supervisor. Concern is no construction entrance, road is prepped with roadmix for the base. No way to get mud off tires, workers are parking on site in mud. Verbal warning issued to keep road clean and install rumble bars or other tire cleaning system. Road is currently clean, says he sweeps at end of day, front entrance is closed and no one is supposed to use it. Major concern is if trackout starts to reach Fairview.
|
Conference | 2/8/2019 | 2/11/2019 | 2/12/2019 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/12/2019 | 2/12/2019 | 2/12/2019 | P | FAIL |
Andy J. Long
|
|
|
Corrections needed:
- street sweeper needs to sweep Dawn Pl. - concrete washout installed is now dried out but the wall on one is broken. Request to build new washout.
Note: re-inspection fees waived, warning and notification provided that any further mismanaged/dumped concrete washout will incur a violation fee.
|
Conference | 2/5/2019 | 2/5/2019 | 2/8/2019 | P | CANC |
Andy J. Long
|
|
|
rescheduled
|
BMP Violation | 1/25/2019 | 1/28/2019 | 1/28/2019 | P | PEND |
Andy J. Long
|
|
|
check on new washout
new above-ground lined washout installed and in use. Inspection conducted with Pat with Biltmore, requested the lining be secured to the sides, which was completed.
Corrections remaining: - sweep gravel and rock out of the streets
Pat wants to have a meeting regarding the re-inspection fees assessed.
Case pending
|
BMP Violation | 1/23/2019 | 1/25/2019 | 1/25/2019 | P | PEND |
Andy J. Long
|
|
|
concrete to be poured Monday. Above ground lined washout will be constructed prior to the pour...
fees not yet paid.
|
BMP Violation | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | FAIL |
Michael Zawacki
|
|
|
Trackout and washout dumped onto ground. Corections needed: Clean trackout, install construction entrance and stabalized parking area. Remove and clean old washout, install new washout with liner.
|