Permit Information
Permit NumberESC18-01593
StatusFinaled
Name JAY ALLRED
Site Address 2015 N CURTIS RD
Project NameKoelsch - New Cafeteria Bldg
Customer Number 
ePlanReviewNo
Description
Proposed new stand-alone cafeteria building at Koelsch Elementary. ESC site plan with project narrative approved and must be implemented. Construction entrance to be installed off Cruzen street, south of the school. Use existing parking lot for worker parking and staging. Protect existing storm drain inlets onsite and on Curtis @ Cruzen. Set up contained concrete washout and trash control. ESC site preparation inspection is REQUIRED.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final11/1/201911/1/201911/1/2019PPASS
DetailsAndy J. Long
Work complete, disturbed area stabilized, no temporary BMPs left behind.
General Inspection9/27/20199/27/201910/1/2019 CANC
DetailsAndy J. Long
General Inspection4/17/20194/25/20194/25/2019PPASS
DetailsMichael Zawacki
Concrete crew on site prepping to lay floor. Kiddie pool washout on site. Staging area on parking lot. Construction area has buffers on each side. No ESC issues.
General Inspection4/15/20194/16/20194/17/2019APASS
DetailsAndy J. Long
project already started. No site prep requested.

BMPs installed. RP also in charge at Hawthorne and we reviewed ESC site preparation requirements.