General Inspection | 6/29/2020 | 6/29/2020 | 7/2/2020 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 7/2/2020 | 7/2/2020 | 7/2/2020 | P | PASS |
Andy J. Long
|
|
|
Scope of project complete. No active construction or new erosion or issues have occured. River bank and greenbelt repairs monitored maintained by Parks n Rec and river system management.
No ESC requests.
|
General Inspection | 6/11/2020 | 6/11/2020 | 6/11/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/27/2020 | 5/27/2020 | 5/29/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/12/2020 | 5/12/2020 | 5/13/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/10/2020 | 4/10/2020 | 4/13/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/26/2020 | 3/26/2020 | 3/27/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/11/2020 | 3/11/2020 | 3/11/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/25/2020 | 2/25/2020 | 2/25/2020 | | PEND |
Andy J. Long
|
|
|
No active construction; monitoring revegetation and ECB installations
|
General Inspection | 2/10/2020 | 2/10/2020 | 2/11/2020 | | CANC |
Andy J. Long
|
|
|
|
Conference | 1/23/2020 | 1/24/2020 | 1/24/2020 | P | CANC |
Andy J. Long
|
|
|
data entry error
|
General Inspection | 1/20/2020 | 1/20/2020 | 1/23/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/3/2020 | 1/3/2020 | 1/6/2020 | | PEND |
Andy J. Long
|
|
|
no corrections at this time. Americana site have revegetated and no issues evident. Need to follow up on the Plantation area repairs
|
General Inspection | 12/19/2019 | 12/19/2019 | 12/19/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/4/2019 | 12/4/2019 | 12/4/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/30/2019 | 11/15/2019 | 11/21/2019 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/30/2019 | 10/30/2019 | 10/30/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
Site Final | 4/4/2019 | 4/5/2019 | 4/8/2019 | P | NR |
Andy J. Long
|
|
|
Work complete. Grass starting to grow through matting. No debris or material left around site. ECBs are anchor trench. No corrections requested.
ESC permit to remain open to monitor revegetation and performance in higher river flows and increased greenbelt use through Spring.
|
General Inspection | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | PART |
Michael Zawacki
|
|
|
Area tackified, trenched at top. Vertically shingled correctly, wrong direction in relation to streamflow.
|
General Inspection | 2/12/2019 | 2/12/2019 | 2/12/2019 | P | PEND |
Andy J. Long
|
|
|
ECB installed at Americana repair site is not the final stabilization product, but was installed to cover the disturbed area during the rain. Jute mating will be used and per Carlo manufacturer installation details will be followed.
WIP. No violations at the Americana site.
|
General Inspection | 1/31/2019 | 1/31/2019 | 2/1/2019 | P | PASS |
Michael Zawacki
|
|
|
Met with contractor and HOA at site. Rock work completed, prepping area for planting.
|
Site Preparation | 1/16/2019 | 1/16/2019 | 1/16/2019 | P | PASS |
Andy J. Long
|
|
|
Meeting with Carlo, Wendy w/ BPR, and Doug with BPW
Staging and entrance off Lake Harbor. No work within the river. Repair include installing fill, jute matting, and plantings to help stabilize the bank.
Request to keep a clean job site, post ESC permit sign, read and follow installation details for the jute matting.
|
Site Final | 6/11/2020 | 6/12/2020 | | A | |
Andy J. Long
|
|
|
|