Site Final | 8/11/2020 | 8/11/2020 | 8/12/2020 | P | PASS |
Andy J. Long
|
|
|
Pathway connection complete. No debris or temporary BMPs left behind. Site is stabilized and landscaped, staging area is clean. ESC permit finaled.
|
General Inspection | 5/18/2020 | 5/19/2020 | 5/19/2020 | P | PASS |
Andy J. Long
|
|
|
WIP on path. Staging area off Americana. No trackout, BMPs installed, vegetation around work area has been preserved. Approved.
|