Permit Information
Permit NumberFIR08-00550
StatusVoid/No Violation
Name PEAK ALARM
Site Address 5256 W FAIRVIEW AVE
Project NamePLAZA SEVEN
Customer Number 
ePlanReview 
Description
08-06-09 PLAN MODIFICATION
This plan modification is to incorporate field modifications to the record drawings. Includes increasing candela due to actual device locations, changing strobe only devices to horn/strobes where audibility requirements were not met, and revising the one-line and calculations based on the field modifications.

08-12-08:
This fire alarm permit is to replace the existing non-functioning fire alarm panel with a new one. Scope includes manual fire alarm system, HVAC & Sprinkler system monitoring (the building is only sprinklered in the basement), and elevator recall functions.
There is no associated building permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIR-Aging Inspection4/25/20184/25/20184/27/2018 NR
DetailsTroy Cobbley
This permit will need to be voided due to another contractor is taken over the work.
FIR-Aging Inspection9/25/20179/25/20179/25/2017 NR
DetailsTroy Cobbley
Waiting for fire dept. follow up and contractor to call for final inspection
FIR-Aging Inspection5/8/20175/8/20175/8/2017 NR
DetailsTroy Cobbley
Waiting on fire dept follow up
FIR-Aging Inspection10/26/201610/26/201611/1/2016 NR
DetailsTroy Cobbley
I turned this over to the fire dept for follow up
FIR-Aging Inspection7/27/20167/27/20167/27/2016 NR
DetailsTroy Cobbley
I spoke to Assistant Chief Ron Johnson about a previous request for help.
INSP-Conference3/11/20163/11/20163/11/2016PDONE
DetailsTroy Cobbley
Wendy contacted me and stated that Peak Alarm is no longer in a business arrangement with the building owner. I spoke to Scott and have forwarded information to Chief Gervais with the Fire Dept.
FIR-Aging Inspection3/7/20163/7/20163/11/2016 NR
DetailsTroy Cobbley
I left a voice message for Wendy the Office Manager requesting that the project be finished up.
INSP-Final Inspection11/7/201311/8/201311/8/2013AFAIL
DetailsTroy Cobbley
Began inspection by verifying the sync of the audio/visual devices. When testing the horns on most of the first floor and the west half of the second floor failed to work. Inspection stopped and no devices tested.
FIR-Aging Inspection10/28/201310/28/201310/29/2013 NR
DetailsTroy Cobbley
I left message for Mike requesting project status
FIR-Aging Inspection9/4/20129/4/20129/12/2012 NR
DetailsTroy Cobbley
I spoke to Jason and Mike and they were going to follow up on this project.
INSP-Final Inspection4/18/20114/20/20114/20/2011PFAIL
DetailsTroy Cobbley
Neither the strobes or the horn were syncronized. Also need to test all initiating devices. Candella needs to be modified to 110cd on the strobe in the old engineering office. End of Line voltage was verified ok as well as spacing of the manual pull stations and audio/visual devices. Netcon was also verified at 5.
FIR-Aging Inspection4/18/20114/18/20114/19/2011 NR
DetailsTroy Cobbley
wip
INSP-Final Inspection2/3/20112/4/20112/4/2011PCANC
DetailsTroy Cobbley
Per Mike madsen and my discussion this inspection will be rescheduled for next week.
FIR-Aging Inspection1/17/20111/17/20111/24/2011 NR
DetailsTroy Cobbley
wip
FIR-Aging Inspection11/15/201011/15/201011/17/2010 NR
DetailsTroy Cobbley
Mike stated that this should be set up for inspection the week after Thanksgiving.
INSP-Final Inspection4/1/20094/2/20094/2/2009AFAIL
DetailsTroy Cobbley
Plans need to be resubmitted for "plan modifications". This is due to extensive audio/visual modifications required such as additional devices, relocated devices and devices that need the candella adjusted brighter. Also the second floor tenant "ABC Channell 6" has a door magnet securing the exit door. The fire alarm contractor and I spoke about minimum sound requirements in the radio transmission rooms where only strobes had been installed and for all rooms. No devices were actually tested. An EOL had to be relocated in the NAC panel so that it would report a trouble
INSP-Conference1/12/20091/12/20091/12/2009PDONE
DetailsTroy Cobbley
I left a message for Mark Cleverly with Thornton Ovliver that we were assured on 12/8/08 the alarm system installation would proceed. I visited the job site and found the alarm system still not functional and the building occupied. I contacted Mike with Peak Alarm and he stated that they would have the PIV connected today and then they would be waiting on phone lines and the elevator. Per the elevator contractor they are atleast three week out. I told Mike that the fire alarm system needs to be up and running. He was going to contact his boss and verify when phone lines would be installed.
FIR-Aging Inspection11/26/200811/26/200812/1/2008 NR
DetailsTroy Cobbley
I contacted peak alarm and they said that they would be on the job at the end of December or January as per their contact. I said "so this building has a non-functioning fire alarm system?" And they said yes.

I have forwarded this information to sam rogers and mark sentenno for further action.