Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberFIR11-00299
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 7009 W FRANKLIN RD
Project NameBishop Kelly
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of a new 6” underground lead in, two temporary main, temporary risers and fire watch. Please, see case file for approval by (Fire Marshal Mr. Ron Amandus) of a 24-hour fire watch. During construction, the riser will be relocated. During the impairment, two temporary mains will supply the sprinkler system. This review is for the 6” underground lead in, temporary mains and temporary riser ONLY.


Building Department Scope:

Bishop Kelly High School - Administration and Main Entry Remodel and Addition - To demolish and remove approximately 7,100 square feet of existing building that contains administrative offices and a storage garage area. To reconstructed that portion of the building to contain reconfigured administrative offices and accessible restrooms and to constructed a 5,375 square foot addition that will contain a new main entry, lobby/study area, waiting area, new student commons and new mens and womens accessible restrooms. This permit also includes the construction of a new exterior entry plaza and other associate site improvements. This addition and remodel is being done on the northwest side of the high school. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/16/20122/16/20122/16/2012PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Conference10/21/201110/21/201110/21/2011PDONE
DetailsTroy Cobbley
I stopped at the job site and found that the "dog house" has been provided as well as heat. This temporary set up is acceptable as previously discussed.
INSP-Conference10/18/201110/18/201110/18/2011PDONE
DetailsTroy Cobbley
I stopped today at Bishop Kelly High School to verify that the "dog house", with heat, had been installed over the sprinkler supply piping. It has not. The piping has been wrapped with concrete blankets which I remember was not an option. The openings along the existing wall are covered with plastic but no heat for the space has been provided.

INSP-Conference10/11/201110/11/201110/11/2011ADONE
DetailsTroy Cobbley
Romeo Gervais and I met with Chad and Rich Raimondi, with Bishop Kelly, about the need for protection of both the fire sprinkler and fire alarm systems that are exposed to the elements. It was agreed that steps would be taken starting today and completed by the end of the week. Chad said he would follow up with me later in the week at which time I will perform a courtesy inspection.
INSP-Conference10/10/201110/10/201110/10/2011PDONE
DetailsTroy Cobbley
I just spoke with the job superintendant at Bishop Kelly. No work has been done for protection of the supply piping that is exposed. The mason did not show up friday to infill the old doorways and no dog house with heat has been built. I discussed that this last weekends temperatures had been in the upper 30's and that they are currently non code compliant. Of the two superintendants here, one stated that by installing this "dog house" we would be conflicting with his framing. An email was sent to the fire dept requesting direction.
INSP-Sprinkler Rough-in8/15/20118/16/20118/16/2011APASS
DetailsTroy Cobbley
The sprinkler rough-in passed. The temporary items have been completed except for a hydro test and a sprinkler head in the temporary riser "dog house".
INSP-Supply line flush8/9/20118/9/20118/9/2011PPASS
DetailsTroy Cobbley
Underground flush passed
INSP-Sprinkler Rough-in/Hydro8/8/20118/8/20118/8/2011PPASS
DetailsTroy Cobbley
The underground hydro test passed.
INSP-Sprinkler Rough-in8/5/20118/5/20118/5/2011PPASS
DetailsTroy Cobbley
The under ground supply piping is ok to cover.
INSP-Sprinkler Rough-in7/19/20117/20/20117/20/2011PPASS
DetailsTroy Cobbley
See the city approved plans for the portion of the 4" and 2 1/2" mains where the rough-in has passed. More new piping has been installed than what is shone on the plans . Per Mike this additional piping will be shown on the new submittals.