Permit NumberFIR12-00054
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 7940 W RIFLEMAN ST Unit: 120
Project NameTowne Square Station
Customer Number 
ePlanReviewNo
Description
The building is completely sprinklered in the attic space for shell protection. The portion of the building under this permit will complete below protection. When this permit is finaled the building will be fully sprinklered. The new portion of the system will connect to an existing 3” main. The system is designed as a tree type system with primarily 1¼" branch piping.


Building Department Scope:

(MATTRESS LAND SLEEP FIT CENTER) New retail mattress tenant in a 6,308 sq. ft. vacant shell space within an existing building. Shell building constructed under BLD06-01424

Contractor’s Note: The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/29/20123/30/20123/30/2012APASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection3/28/20123/29/20123/29/2012AFAIL
DetailsTroy Cobbley
Baffles have not been installed yet.
INSP-Sprinkler Rough-in/Hydro3/19/20123/20/20123/20/2012PPASS
DetailsTroy Cobbley
Hydro test passed. Waiting for the plan modifications to be approved to finish out permit
INSP-Sprinkler Rough-in3/15/20123/15/20123/15/2012PFAIL
DetailsTroy Cobbley
Sprinkler heads are blocked by hvac roof penatrations/duct work in three locations. The head spacing shall meet NFPA 13 8.6.5.2.1.2 and 8.6.5.1.2. Unfortunatly some of this work is located in a remote hydraulic area. Also a soffit has been added at the main entry that was not shown on the plans. At this soffit the fitter added two additional heads. This now puts five heads on an 1 1/4" line where the remote area is flowing four heads off of 1 1/2" (1 1/4" branchline with 1 1/2" riser nipples). After speaking with Tim Frost it was determined that plan modifications will be needed prior to a final sign off showing all changes.
INSP-Sprinkler Rough-in2/22/20122/22/20122/22/2012PPASS
DetailsTroy Cobbley
Todays inspection covered the hangers and their attachment to the building structure. The fitter wants to use fencing nails to hold the all thread rods to the trusses thus elliminating the branchline seismic bracing. I defered him to plan review for a determination.