Permit Information
Permit NumberFIR12-00056
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 11311 W CHINDEN BLVD
Project NameHP - BLDG 7
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of changing the existing fire protection to provide new fire protection that is adequate for rack storage (3 new racks). A new small grid will be added to an existing tree system utilizing ELO 231 sprinklers for the new rack storage area. The existing sprinklers will removed and plugged in the new rack storage area. The rest of the fire protection system is to remain unchanged

Location on Plan - South West portion of Building #7
Commodity - Plastic Printers
Classification - Group A Plastics
Storage Type (rack, solid pile, etc.) - Racks
Pallet Type (wood or plastic) - Pallet type is unknown but will be stored outside
Aisle Width - 3’-6”
Height of Storage - 14’-0”
Ceiling Height - 16’-0”
Encapsulated - na
Solid Shelves - No
Smoke and Heat Vents - Not Required
Draft Curtain - Not Required
Building Access - Not Required
In Rack Sprinklers - No
Sprinkler Type - ELO-231
High Temperature Sprinklers Required - Not Required
NFPA Section - Fig. 17.2.1.2.1 (A), Fig. 17.2.1.2.1 (B) Interpolated
Hose Stream Requirements - 500



Contractor’s Note: The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/21/20123/22/20123/22/2012PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection3/20/20123/21/20123/21/2012PCANC
DetailsTroy Cobbley
Cancel per Troy until the ceiling tile is installed.
INSP-Sprinkler Rough-in/Hydro3/20/20123/21/20123/21/2012APASS
DetailsTroy Cobbley
The overhead hydro test passed.
INSP-Final Inspection3/20/20123/20/20123/20/2012PFAIL
DetailsTroy Cobbley
Project is not ready for final. Piping needs to be hydro tested and the ceiling tile installed. Rough-in passed and the piping can be covered.