FIR-Aging Inspection | 9/23/2015 | 9/23/2015 | 9/30/2015 | | PASS |
Troy Cobbley
|
|
|
passed
|
INSP-Final Inspection | 9/29/2015 | 9/29/2015 | 9/29/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 5/12/2014 | 5/15/2014 | 5/15/2014 | A | FAIL |
Troy Cobbley
|
|
|
Central station is not receiving any trouble signals.
|
FIR-Aging Inspection | 5/6/2014 | 5/6/2014 | 5/7/2014 | | NR |
Troy Cobbley
|
|
|
Waiting for contractor to to schedule inspection with new plans
|
FIR-Aging Inspection | 1/21/2014 | 1/21/2014 | 1/24/2014 | | NR |
Troy Cobbley
|
|
|
I sent an email to steve with simplex requesting a follow up
|
FIR-Aging Inspection | 5/27/2013 | 5/27/2013 | 6/4/2013 | | NR |
Troy Cobbley
|
|
|
I spoke to Curtis at SimplexGrinnell and he is going to follow up with Charlie and Steve on the job status.
|
FIR-Aging Inspection | 2/13/2013 | 2/13/2013 | 2/13/2013 | | NR |
Troy Cobbley
|
|
|
Per steve with simplexgrinnell the DSC permits will be scheduled soon.
|
FIR-Aging Inspection | 9/21/2012 | 9/21/2012 | 9/21/2012 | | NR |
Troy Cobbley
|
|
|
Per Steve, with SimplexGrinnell, these DSC permits will be called in the first part of October for inspections.
|