INSP-Final Inspection | 10/10/2012 | 10/10/2012 | 10/10/2012 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. The annual inspection has just expired but Don with Curtis Fire has been contracted to do the new inspection. He will call me when completed.
|
FIR-Aging Inspection | 10/2/2012 | 10/2/2012 | 10/10/2012 | | NR |
Troy Cobbley
|
|
|
I spoke to Don and he is going to get the project scheduled for a final.
|
INSP-Sprinkler Rough-in/Hydro | 5/14/2012 | 5/14/2012 | 5/14/2012 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test for the new piping passed. Witnessed gain in pressure. Piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 5/11/2012 | 5/11/2012 | 5/11/2012 | P | PART |
Troy Cobbley
|
|
|
Project was not ready for hydro test but the sprinkler rough-in passed.
|