Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberFIR12-00247
StatusFinaled
Name JBL FIRE PROTECTION LLC
Site Address 1437 S GOLDKING WAY
Project NameUnion Square Apartments
Customer NumberUDG ONLY
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of 4” CPVC underground to seven apartment building with necessary restraints and thrust blocks.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/25/20134/25/20134/25/2013PPASS
DetailsTroy Cobbley
permit finaled
FIR-Aging Inspection3/14/20133/14/20133/15/2013 NR
DetailsTroy Cobbley
work is in progress
INSP-Sprinkler Rough-in12/4/201212/4/201212/4/2012PPASS
DetailsTroy Cobbley
flush for bldgs 5, 6 & 7 - passed inspection
INSP-Supply line flush10/30/201210/31/201210/31/2012APASS
DetailsTroy Cobbley
Underground flush of buildings 8 and 10 passed
INSP-Sprinkler Rough-in10/30/201210/31/201210/31/2012ACANC
DetailsTroy Cobbley
Underground fluch - Jonathan Phone #: ###-####///scheduled wrong type
INSP-Supply line flush9/25/20129/25/20129/25/2012PPASS
DetailsTroy Cobbley
blg 9, Underground supply line flush passed
INSP-Supply line flush9/24/20129/25/20129/25/2012APASS
DetailsTroy Cobbley
blg 11,underground supply line flush passed
INSP-Sprinkler Rough-in9/6/20129/7/20129/7/2012APASS
DetailsTroy Cobbley
Underground hydro tests for BLD 5, 6 & 7 passed.
INSP-Sprinkler Rough-in8/30/20128/31/20128/31/2012APART
DetailsForrest France
UG fire supply lines including the IBR's at buildings 5, 6, and 7 are approved for bury- see clouded annotations with today's date on stamped plan set. Note* supply pipe route changes matching field modifications are included on the overhead plan set.
INSP-Sprinkler Rough-in/Hydro8/16/20128/17/20128/17/2012APART
DetailsForrest France
UG fire supply line hydrostatic test for building 10 passed.
INSP-Sprinkler Rough-in8/15/20128/16/20128/16/2012APASS
DetailsTroy Cobbley
The underground hydro for Bld 8 passed
INSP-Sprinkler Rough-in8/15/20128/16/20128/16/2012APASS
DetailsTroy Cobbley
The underground cover for bld 10 passed.
INSP-Sprinkler Rough-in8/15/20128/15/20128/15/2012PCANC
DetailsTroy Cobbley
Concrete for thrust blocks not available. To be canceled per johnathan- this is for underground cover bld 10 Phone #: ###-####
INSP-Sprinkler Rough-in8/3/20128/3/20128/6/2012PPASS
DetailsTroy Cobbley
Jonathan underground supply cover for bld 8 is ok to cover.
INSP-Sprinkler Rough-in/Hydro8/3/20128/3/20128/3/2012PPASS
DetailsTroy Cobbley
Hydro test bld 11 on underground supply passed.
INSP-Sprinkler Rough-in8/2/20128/3/20128/3/2012PPASS
DetailsTroy Cobbley
Hydro test of bld 9 underground passed.
INSP-Sprinkler Rough-in7/30/20127/30/20127/30/2012PPASS
DetailsTroy Cobbley
The underground cover inspection for bld 10 passed.
INSP-Sprinkler Rough-in7/26/20127/27/20127/27/2012APART
DetailsForrest France
UG fire supply line cover at buildings 9 and 11 approved for bury. Modifications to the original design are included in the new overhead plans.
INSP-Sprinkler Rough-in7/25/20127/26/20127/27/2012PPART
DetailsForrest France
Field changes in UG fire supply line routing for buildings 9 and 11 field verified and approved- see dated and initialed notes on the stamped plan set.
INSP-Sprinkler Rough-in6/1/20126/4/20126/4/2012PPASS
DetailsTroy Cobbley
See the city approved plans for the locations at four buildings where a partial approval has been given to cover the underground supply piping. Locations are marked in red with approximate pipe lengths.