INSP-Final Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit final approved.
|
INSP-Sprinkler Rough-in | 1/6/2014 | 1/6/2014 | 1/6/2014 | A | PART |
Forrest France
|
|
|
Fire sprinkler work completed to date and as marked on approved plans okayed for cover.
|
INSP-Sprinkler Rough-in | 1/2/2014 | 1/2/2014 | 1/2/2014 | P | PART |
Forrest France
|
|
|
Proposed changes to pipe routing and coverage at the short hall and adjacent two offices okayed pending accurate as-builts are provided at final.
|
INSP-Sprinkler Rough-in | 12/4/2013 | 12/4/2013 | 12/4/2013 | P | PART |
Forrest France
|
|
|
Okayed for cover fire sprinkler system modifications at the procedure room, exam room and hall as clouded and dated on approved plans.
|
INSP-Sprinkler Rough-in | 9/10/2013 | 9/10/2013 | 9/10/2013 | P | PART |
Forrest France
|
|
|
Rough-in at one exam room and the new work room okayed- note* Floorplan does not match provided permit documents, field modifications to branchline also noted.
|
FIR-Aging Inspection | 5/7/2013 | 5/7/2013 | 5/7/2013 | | DONE |
Forrest France
|
|
|
|
FIR-Aging Inspection | 1/31/2013 | 1/31/2013 | 2/1/2013 | | DONE |
Forrest France
|
|
|
In progress
|
FIR-Aging Inspection | 10/25/2012 | 10/25/2012 | 10/30/2012 | | DONE |
Forrest France
|
|
|
In progress
|