INSP-Final Inspection | 12/14/2012 | 12/17/2012 | 12/17/2012 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough and inspection.
|
INSP-Final Inspection | 12/14/2012 | 12/14/2012 | 12/14/2012 | P | CANC |
Forrest France
|
|
|
Mark J is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 11/1/2012 | 11/2/2012 | 11/2/2012 | A | PART |
Forrest France
|
|
|
Inspection for cold cavity protection completed okay after adjustments made while on site by the general contractor. Overhead rough-in approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 10/29/2012 | 10/30/2012 | 10/30/2012 | P | PART |
Forrest France
|
|
|
OH hydrostatic test completed.
|