Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberFIR12-00695
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 9101 W FAIRVIEW AVE
Project NamePETERSON TOYOTA
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration. The existing building will have two new additions and one new canopy. A new antifreeze system will be added to a canopy. The protection will be broken into two systems due to exceeding 52000 ft^2. The existing underground piping supplying the existing hydrant will be abandoned since the piping is under the footprint of the new service shop addition. A new 6” underground lead in will be brought into the building. The existing backflow preventer is located in vault at the northern edge of the parking lot. Two 6” riser supplies the project from a common 8” header with a wall PIV. This is a large facility with multiple grids
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/29/201311/1/201310/31/2013APASS
DetailsTroy Cobbley
permit finaled
INSP-Alarm Testing10/11/201310/14/201310/14/2013AFAIL
DetailsTroy Cobbley
Interconnection of the tamper switches and flow switches with the FACP passed inspection. Forward flow tests passed as well.
INSP-Final Inspection10/10/201310/14/201310/11/2013ACANC
DetailsTroy Cobbley
kerry Phone #: ###-#### Inspection cancelled from web by: Jeff Packham
INSP-Sprinkler Rough-in/Hydro10/8/201310/9/201310/9/2013APASS
DetailsTroy Cobbley
Overhead hydro passed
INSP-Sprinkler Rough-in/Hydro10/8/201310/8/201310/8/2013PCANC
DetailsTroy Cobbley
hyro test // Kerry Phone #: ###-####
INSP-Sprinkler Rough-in10/7/201310/8/201310/8/2013APASS
DetailsTroy Cobbley
See the city approved plans for locations with todays date where additional piping is ok to cover.
INSP-Sprinkler Rough-in9/10/20139/11/20139/11/2013APASS
DetailsTroy Cobbley
Lounge area piping is ok to cover..
INSP-Sprinkler Rough-in8/28/20138/29/20138/29/2013APASS
DetailsTroy Cobbley
See the city approved plans for new areas where piping is ok to cover.
INSP-Final Inspection8/22/20138/23/20138/23/2013APART
DetailsTroy Cobbley
Sprinkler work in the lube bay expansion and the Service Shop expansion is complete except for as-builts showing the re-routing of mains. Also the Lexus drive through/canopy fire sprinkler system is now active so it can be used for driving through.
INSP-Sprinkler Rough-in/Hydro7/26/20137/26/20137/26/2013PPART
DetailsForrest France
UG fire supply line hydrostatic test completed satisfactory.
INSP-Sprinkler Rough-in/Hydro7/24/20137/25/20137/25/2013APART
DetailsForrest France
Overhead hydrostatic test of the new wet system serving the lube bay completed
INSP-Supply line flush7/23/20137/23/20137/23/2013PPASS
DetailsTroy Cobbley
The remaining underground is ok for cover and the flush for the two IBR's and the fire hydrant passed.
INSP-Sprinkler Rough-in7/22/20137/23/20137/23/2013APASS
DetailsTroy Cobbley
See the city approved plans for location where underground supply piping can be covered.
INSP-Sprinkler Rough-in7/22/20137/22/20137/22/2013PCANC
DetailsTroy Cobbley
Cancelled due to being over booked. Rescheduled for tomorrow.
INSP-Sprinkler Rough-in7/3/20137/5/20137/5/2013APASS
DetailsTroy Cobbley
See the city approved plans for areas where rough-in passed and in some locations the piping can be covered. Still need seismic bracing for the brachline piping located in the Car Wash.
INSP-Sprinkler Rough-in7/2/20137/3/20137/3/2013APART
DetailsTroy Cobbley
See the city approved plans for rough-in inspection locations for today. Mostly passed but seismic restraint for the branchlines is missing is all location inspected today. Will need as-bults showing the new routing of the two 6" main in the service area. The car wash area piping size as installed does not match the approved plans.
INSP-Final Inspection5/7/20135/7/20135/7/2013PPART
DetailsTroy Cobbley
Piping in the "Bull Pen" and "Accounting" areas is completed.
INSP-Sprinkler Rough-in/Hydro5/7/20135/7/20135/7/2013PPASS
DetailsTroy Cobbley
Overhead hydro test of the anti-freeze loop passed
INSP-Sprinkler Rough-in5/2/20135/3/20135/3/2013APART
DetailsForrest France
UG fire supply line IBR only- inspected and approved for cover. Plans initialed and dated.
INSP-Sprinkler Rough-in5/2/20135/3/20135/3/2013APART
DetailsForrest France
Refer to clouded and dated area on stamped plan set for overhead work inspected for cover approval.
INSP-Sprinkler Rough-in5/1/20135/2/20135/2/2013APASS
DetailsTroy Cobbley
south canopy at lexus showroom is ok to cover the sprinkler piping. Siesmic branchline restraints and retaining straps have been provided.
INSP-Final Inspection5/1/20135/2/20135/2/2013APART
DetailsTroy Cobbley
Area #1 lexus showroom/lounge/cafe, Area #2 mezzanine upper/lower sprinkler work is complete.
INSP-Sprinkler Rough-in4/17/20134/17/20134/17/2013PPASS
DetailsTroy Cobbley
See the city approved plans for locatins in the northwest corner of the building marked "ok" where sprinkler piping can be covered.
INSP-Sprinkler Rough-in4/10/20134/10/20134/10/2013PPASS
DetailsTroy Cobbley
See the city approved plans for location marked in red where the sprinkler piping can be covered.