INSP-Final Inspection | 7/24/2013 | 7/24/2013 | 7/24/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 7/17/2013 | 7/18/2013 | 7/18/2013 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover. Sheet rock has been removed.
|
INSP-Sprinkler Rough-in | 7/15/2013 | 7/16/2013 | 7/16/2013 | A | PART |
Troy Cobbley
|
|
|
Pendant head spacing is ok but insulation is falling from the deck and creating an obstruction to the upright sprinkler heads. Also two runs of sheet rock, which are attached to the trusses above the ceiling are creating an obstruction to the upright sprinkler coverage.
|