INSP-Final Inspection | 9/12/2013 | 9/13/2013 | 9/13/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/6/2013 | 9/9/2013 | 9/12/2013 | P | PART |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 8/26/2013 | 8/26/2013 | 8/26/2013 | P | FAIL |
Tim Frost
|
|
|
Failed - One sprinkler missing in the foyer to the kitchen area. Unable to verify if pipe sizes were changed. Ceiling tile was installed. No fitter on job site. Could not verify if the sidewall sprinkler below the garage door was extended throw type. Sprinklers were space slightly different from what was shown but appear to be adequate.
|
INSP-Sprinkler Rough-in | 8/22/2013 | 8/23/2013 | 8/23/2013 | A | PART |
Forrest France
|
|
|
Fire sprinkler work above drop ceilings in the seating area, second floor office, storage and stairway are approved for cover per dated annotations on approved plans.
|
INSP-Sprinkler Rough-in | 8/1/2013 | 8/2/2013 | 8/2/2013 | A | PASS |
Troy Cobbley
|
|
|
The supply piping that was installed as 1" has been correct to match the required 1 1/4". The piping in the restroom walls can now be covered.
|
INSP-Sprinkler Rough-in | 8/1/2013 | 8/1/2013 | 8/1/2013 | P | PART |
Troy Cobbley
|
|
|
Soffits as marked "ok" in red are ok to cover. But acouple issues need to be addressed which include the branchline supply piping to the heads in the east side soffit is shown on the plans as 1 1/4 but 1" has been installed (4 heads are being supplied). Also the supply piping for the sidewalls is shown to be 1 1/4" but only 1" has been installed (3 heads are being supplied). Soffits are ok to cover but piping needs to be installed as approved or plan modifications are needed for the pipe size changes.
|