INSP-Final Inspection | 1/2/2014 | 1/6/2014 | 1/6/2014 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 9/24/2013 | 9/24/2013 | 9/25/2013 | P | PASS |
Troy Cobbley
|
|
|
Tenting has been corrected and piping can be covered.
|
INSP-Sprinkler Rough-in | 9/23/2013 | 9/24/2013 | 9/24/2013 | A | FAIL |
Troy Cobbley
|
|
|
Tenting still is not repaired. Piping can not be covered.
|
INSP-Sprinkler Rough-in | 9/16/2013 | 9/16/2013 | 9/16/2013 | P | FAIL |
Troy Cobbley
|
|
|
Several locations need the tenting modified to provide coverage of the sprinkler piping.
|
INSP-Sprinkler Rough-in | 9/12/2013 | 9/12/2013 | 9/12/2013 | P | PASS |
Troy Cobbley
|
|
|
The pipe routing now matches the plan modifications. Still need a tenting inspection on the third floor. Overspaced pendants on the first and second floors have been corrected.
|
INSP-Sprinkler Rough-in/Hydro | 9/12/2013 | 9/12/2013 | 9/12/2013 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro passed for all floors.
|
INSP-Sprinkler Rough-in | 9/10/2013 | 9/11/2013 | 9/11/2013 | P | PART |
Troy Cobbley
|
|
|
Plans need to be resubmitted due to extensive pipe routing changes on the first and second floors. Third floor piping matches but can not be covered until a tenting inspection has been passed. I noted eight overspaced heads on the first and second floors at the east and west end bedrooms (see marked plans). All in all no piping can be covered yet.
|