Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberFIR13-00693
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 800 W MAIN ST Unit: 1100
Project NameA10 Capital T.I.
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

This building is fully fire sprinklered for high-rise building provisions. To build out for the first time the entire 13,652 square foot 11th floor of this high-rise building for this tenant. The shell building was constructed under BLD12-01991. This project will occupy the entire 11th story. Work to include: interior nonbearing walls to create office spaces, conference rooms, breakrooms, copy/storage rooms, and office support areas; interior windows, interior doors, suspended acoustical ceilings, suspended gypsum board ceilings, gypsum board ceiling soffits, millwork, and finishes; mechanical, electrical and plumbing work. All work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. NOTE: This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/10/20143/10/20143/12/2014PPASS
DetailsForrest France
Scope of fire sprinkler work approved for final after corrections and adjustments made. Inspection passed.
INSP-Final Inspection3/5/20143/7/20143/7/2014APART
DetailsForrest France
Final pending egress corridor ceilings, remainder of ceiling finishes.
INSP-Sprinkler Rough-in3/4/20143/5/20143/5/2014APART
DetailsForrest France
Remainder of overhead work at the grid ceilings completed. Okayed for cover.
INSP-Sprinkler Rough-in2/24/20142/25/20142/25/2014APART
DetailsForrest France
Okay to cover overhead fire sprinkler work at the grid ceilings.
INSP-Sprinkler Rough-in1/24/20141/24/20141/24/2014PPART
DetailsCraig D. Hanson
rough in for hard lids only. 11th floor. pass.