INSP-Final Inspection | 3/25/2014 | 3/26/2014 | 3/26/2014 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/26/2014 | 3/26/2014 | 3/26/2014 | A | PASS |
Craig D. Hanson
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 2/27/2014 | 2/28/2014 | 2/28/2014 | P | FAIL |
Troy Cobbley
|
|
|
We did a quick pre-test and found that the electrical appliances under the hood did not shunt upon activation of the micro-switch. So we did not proceed with the test.
|
INSP-Sprinkler Rough-in/Hydro | 2/24/2014 | 2/24/2014 | 2/27/2014 | P | CANC |
Craig D. Hanson
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 2/26/2014 | 2/27/2014 | 2/27/2014 | P | CANC |
Troy Cobbley
|
|
|
Inspection must be done between 12 - 2 pm. Phone #: ###-#### >> Inspection requested via web by Mary Castle Inspection cancelled from web by: Mary Castle
|