INSP-Final Inspection | 3/23/2015 | 3/24/2015 | 3/25/2015 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit final approved.
|
INSP-Sprinkler Rough-in/Hydro | 8/14/2014 | 8/15/2014 | 8/15/2014 | A | PART |
Forrest France
|
|
|
UG hydrostatic testing for both the remote FDC and the UG fire supply line completed satisfactory.
|
INSP-Supply line flush | 8/13/2014 | 8/13/2014 | 8/13/2014 | P | PART |
Forrest France
|
|
|
UG fire supply line and remote FDC flush completed.
|
INSP-Sprinkler Rough-in | 6/30/2014 | 6/30/2014 | 7/1/2014 | P | PART |
Forrest France
|
|
|
Remote FDC piping okayed for cover.
|
INSP-Sprinkler Rough-in | 6/30/2014 | 7/1/2014 | 7/1/2014 | A | PART |
Forrest France
|
|
|
Okay to cover remainder of UG fire supply line including remote FDC piping. Need to provide seismic clearance method at the ductile riser, wrap galvanized FDC stub.
|
INSP-Sprinkler Rough-in | 6/30/2014 | 6/30/2014 | 6/30/2014 | A | NR |
Forrest France
|
|
|
Thrust blocking not yet finished per contractor.
|
INSP-Sprinkler Rough-in | 6/25/2014 | 6/26/2014 | 6/26/2014 | A | PART |
Forrest France
|
|
|
UG fire supply line including the ductile stub and pipe to a point even with the SE corner of the building okayed for cover.
|