INSP-Final Inspection | 9/29/2014 | 9/30/2014 | 9/30/2014 | A | PASS |
Forrest France
|
|
|
Correction items completed. Fire sprinkler permit finaled.
|
INSP-Final Inspection | 9/25/2014 | 9/29/2014 | 9/29/2014 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed. Final overhead walkthrough also completed, outside bell tested okay. Items needed prior to final include; certify DCVA, provide inspectors test, missing escutcheon below stairway, noted several damaged escutcheons.
|
INSP-Sprinkler Rough-in/Hydro | 7/16/2014 | 7/17/2014 | 7/17/2014 | A | PASS |
Troy Cobbley
|
|
|
Tenting inspection passed on the second floor. All piping can be covered
|
INSP-Sprinkler Rough-in/Hydro | 7/15/2014 | 7/16/2014 | 7/16/2014 | A | FAIL |
Troy Cobbley
|
|
|
Second floor tenting is still not fixed
|
INSP-Sprinkler Rough-in/Hydro | 7/14/2014 | 7/15/2014 | 7/15/2014 | A | PART |
Troy Cobbley
|
|
|
Tenting on first floor is ok and piping can be covered. Second floor piping can not be covered due to tenting problems.
|
INSP-Sprinkler Rough-in | 7/9/2014 | 7/9/2014 | 7/9/2014 | P | PART |
Forrest France
|
|
|
UG fire supply line okayed for bury. Overhead rough-in inspection completed- *Need to meet min. spacing at pendent heads in three rooms affecting 8 heads total. Tenting is not installed at this time.
|