INSP-Sprinkler Rough-in/Hydro | 2/9/2015 | 2/9/2015 | 2/9/2015 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro tests passed
|
INSP-Final Inspection | 2/9/2015 | 2/9/2015 | 2/9/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Supply line flush | 1/19/2015 | 1/20/2015 | 1/20/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in/Hydro | 1/12/2015 | 1/12/2015 | 1/12/2015 | P | FAIL |
Troy Cobbley
|
|
|
Left message on contacts voice mail. Went to project and did not make contact. Systems are not pumped up for the requested hydro test. No inspection was performed.
|
INSP-Sprinkler Rough-in/Hydro | 12/22/2014 | 12/23/2014 | 12/23/2014 | P | PASS |
Troy Cobbley
|
|
|
Not ready for hydro test but the tenting inspection passed and piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 12/22/2014 | 12/23/2014 | 12/22/2014 | P | CANC |
Troy Cobbley
|
|
|
This is a tenting/OH Hydro inspection. Richard C is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 12/16/2014 | 12/17/2014 | 12/17/2014 | A | FAIL |
Troy Cobbley
|
|
|
Hydro tests failed due to visible loss of pressure at the guages.
|
INSP-Sprinkler Rough-in/Hydro | 12/15/2014 | 12/16/2014 | 12/16/2014 | A | FAIL |
Troy Cobbley
|
|
|
Overhead hydro test failed on both systems due to visible loss of pressure on the guages.
|
INSP-Sprinkler Rough-in | 10/15/2014 | 10/15/2014 | 10/15/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover
|